One of the core competencies of Winlogix is the design and development of enterprise information systems. From the initial feasibility study to the final implementation and support, Winlogix has the necessary expertise and track record.
Winlogix uses an ISO-9001 compliant formal software development methodology with well-defined phases and associated deliverables. Each of these phases has parallel project management and risk management practices in place to guide, control, and manage the quality of its resulting deliverables.
Winlogix uses a hybrid RAD – Waterfall approach to implementing the various software modules. This ensures iterative delivery of the software while adhering to a well-defined methodology and standards. The key steps in the Winlogix approach are:
- Requirements Analysis
- System Design
- Product Development
- Testing & Quality Assurance
- Implementation & Support
Within each of these steps there are industry-standard validation and verification procedures to ensure that the quality and conformance of the final deliverables. The deliverables include:
- High level Project Plan
- Requirements Document
- Design Document
- Navigational Prototype
- Beta Version of Software for Acceptance Testing
- Test Plans, Test Cases, and Test Scenarios
- Final Version of Software for Production Implementation